Reservoir modeling:

There are several reasons why an integrated reservoir modeling has found a strong and rapid development:

  • For a reliable evaluation of the bulk and net rock volumes, and the original hydrocarbons in place
  • For an assessment of the minimum well number required to produce the reservoir economically, as well as for the optimal selection of well type (e.g. vertical, slant,horizontal, multilateral, etc.) and locations
  • For an economic/technical evaluation of implementing IOR/EOR processes to increase the final recovery
  • For verifying the consistency of all static and dynamic data reducing the uncertainties always present in a reservoir model.

You can Contact us with

Facebook Page:https://www.facebook.com/Initiative.Courses/
Twitter:https://twitter.com/nourgam75034893
LinkedIn:https://www.linkedin.com/company/18068122/admin/

Website:http://www.selftrainingsto.net

Contact :
skype: self.tranning

what’s app: +201120828201,+201010443910

اترك رد

إملأ الحقول أدناه بالمعلومات المناسبة أو إضغط على إحدى الأيقونات لتسجيل الدخول:

شعار ووردبريس.كوم

أنت تعلق بإستخدام حساب WordPress.com. تسجيل خروج   /  تغيير )

Google photo

أنت تعلق بإستخدام حساب Google. تسجيل خروج   /  تغيير )

صورة تويتر

أنت تعلق بإستخدام حساب Twitter. تسجيل خروج   /  تغيير )

Facebook photo

أنت تعلق بإستخدام حساب Facebook. تسجيل خروج   /  تغيير )

Connecting to %s

هذا الموقع يستخدم خدمة Akismet للتقليل من البريد المزعجة. اعرف المزيد عن كيفية التعامل مع بيانات التعليقات الخاصة بك processed.

%d مدونون معجبون بهذه:
search previous next tag category expand menu location phone mail time cart zoom edit close